Posts Tagged ‘hype’

Why Six Sigma is an All-Or-None Proposition

Monday, July 27th, 2009

A “toe in the water” approach won’t always tell you if six sigma will work.

Recently some prospective clients asked me for a demonstration project to help them determine if six sigma would be a good idea at their company. I advised them against it. Such a demonstration only shows management’s lack of commitment to the success of six sigma. Although philosophical issues are important, there are more concrete problems with such “toe in the water” projects. In particular, major quality improvements can sometimes yield little or no bottom-line cost impact. The result of such projects is to convince management that six sigma adds cost without adding value. This belief is, of course, totally wrong. But it’s also a logical result of the demonstration approach itself.

For example, Sam was a six sigma enthusiast. He’d studied its use at several major companies and was convinced that it would save his company, which we’ll call Acme, millions of dollars. The hype had also caught the attention of the senior leadership at Sam’s company. But before diving headlong into six sigma, they wanted Sam to conduct a demonstration project to see if the savings reported by the press could actually be obtained at Acme.

The company’s main product was a complex assembly, which Acme sold to a large aerospace customer. The assembly- manufacturing process was in statistical control and producing an average of 10 defects per assembly. With management’s support, Sam documented the cost of noncompliance to be about $1,000 per assembly. After months of diligent effort, Sam’s six sigma team was able to redesign the process. To their delight, they were able to reduce the number of defects per assembly by a full 50 percent, from 10 defects per assembly to five.

Management was also interested in the project. But the accounting department had carefully monitored the costs for the assemblies, and to everyone’s surprise, accounting found only a minuscule 0.7-percent cost savings.

Based on these results, leadership’s conclusion was simple: Quality doesn’t pay. The company won’t pursue six sigma any further.

Did accounting make a mistake? In a word, no. The problem arose because Sam measured quality as defects. The truth is that most costs are incurred because of defectives rather than because of defects. (Thanks to Mikel Harry of the Six Sigma Academy for this insight.) A defective is a unit of product or service that contains one or more defects. Whether a unit contains one defect or several is irrelevant. Customers generally react to defective units by returning them for warranty repair, refunds or other options. Internally, defective units must be identified through costly inspection and then routed through equally costly rework processes, or else scrapped entirely. A unit with one defect costs nearly as much as one with several.

Mathematically, the Poisson distribution describes the relationship between defects and defectives. The equation for the Poisson distribution is

In the equation, x represents the number of defects in the sample, and P(x) means the probability of finding x defects. For example, P(1) is the probability of finding one defect. The symbol μ is the average number of defects per unit of product or service. For Sam’s project, the average assembly had 10 defects before six sigma was applied, so μ = 10. The efforts of the six sigma team reduced the average number of defects per assembly to 5, for a 50 percent improvement in quality.

Let’s plug these numbers into the equation and see what happens. Because we are interested in the probability of an assembly being defect-free, we want to know P(0) for each of the two quality levels. Before six sigma, with μ = 10 we get

In other words, there were virtually no defect-free circuit assemblies before applying six sigma methodologies. After applying six sigma, the probability of getting a defect-free assembly at Acme was

Thus, a 50-percent improvement in the quality level as measured in defects produces only a 0.7-percent improvement in the number of defect-free circuit assemblies. A complete graph of this relationship is shown in Figure 1.

Figure 1-Quality Improvement vs. Cost Savings

The real cost-reduction benefits only start to appear when quality reaches very high levels. This relationship explains the commonly observed phenomenon of quality programs not paying off in the short term. Only when companies stick with it long enough to begin to approach six sigma quality levels do they get the desired results. Too often, “toe in the water” projects scare companies out of the pool before they even start to swim.

GD Star Rating
loading...

Get Certified!

Be trained by Thomas Pyzdek

Black Belt

Green Belt

Learn More!

Resources for Six Sigma


Introduction to Six Sigma
Six Sigma Projects
Six Sigma Tools
Six Sigma Statistics
Six Sigma Videos (Requires QuickTime)
Leading Six Sigma
Healthcare Quality
Process Excellence Podcasts
Other Useful Links
Good books on Six Sigma and other topics

What is Six Sigma?

By Thomas Pyzdek, Author of The Six Sigma Handbook

For Motorola, the originator of Six Sigma, the answer to the question "Why Six Sigma?" was simple: survival. Motorola came to Six Sigma because it was being consistently beaten in the competitive marketplace by foreign firms that were able to produce higher quality products at a lower cost. When a Japanese firm took over a Motorola factory that manufactured Quasar television sets in the United States in the 1970s, they promptly set about making drastic changes in the way the factory operated. Under Japanese management, the factory was soon producing TV sets with 1/20th the number of defects they had produced under Motorola management. They did this using the same workforce, technology, and designs, making it clear that the problem was Motorola's management. Eventually, even Motorola's own executives had to admit "our quality stinks." Read More...