<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Pyzdek Institute &#187; headcount</title>
	<atom:link href="http://www.sixsigmatraining.org/tag/headcount/feed" rel="self" type="application/rss+xml" />
	<link>http://www.sixsigmatraining.org</link>
	<description>Lean Six Sigma Training and Information</description>
	<lastBuildDate>Wed, 08 Feb 2012 01:36:25 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>Lean Six Sigma Improvement and Work Design, Part 7</title>
		<link>http://www.sixsigmatraining.org/lean-six-sigma/lean-six-sigma-improvement-and-work-design-part-7.html?source=rss</link>
		<comments>http://www.sixsigmatraining.org/lean-six-sigma/lean-six-sigma-improvement-and-work-design-part-7.html#comments</comments>
		<pubDate>Mon, 26 Jul 2010 07:26:42 +0000</pubDate>
		<dc:creator>Thomas Pyzdek</dc:creator>
				<category><![CDATA[lean-six-sigma]]></category>
		<category><![CDATA[black belt training]]></category>
		<category><![CDATA[cycle time]]></category>
		<category><![CDATA[headcount]]></category>
		<category><![CDATA[lean six sigma black belt]]></category>
		<category><![CDATA[machine time]]></category>
		<category><![CDATA[manual time]]></category>
		<category><![CDATA[six sigma black belt]]></category>
		<category><![CDATA[six-sigma]]></category>
		<category><![CDATA[time calculation]]></category>
		<category><![CDATA[time line]]></category>
		<category><![CDATA[travel time]]></category>
		<category><![CDATA[work cell layout]]></category>

		<guid isPermaLink="false">http://www.sixsigmatraining.org/?p=2548</guid>
		<description><![CDATA[As discussed earlier, the equipment used for Lean production tends to be smaller and more mobile. It is usually possible to rearrange the equipment in a work cell quickly so different parts can be made using the same equipment. Work cell design should make this as simple to do as possible.]]></description>
			<content:encoded><![CDATA[<p><em>This is the seventh post in a series taken</em> <em>from a lesson    in   Pyzdek Institute Lean  Six Sigma Black Belt training. Future posts    will   continue the topic. You can find all of the articles in the    series by  searching this  site for the title.</em></p>
<h2>How many people are needed?</h2>
<p>Consider the process described in <a href="http://www.sixsigmatraining.org/2010/06/figure-3.jpg?source=rss"title="Production Capacity for Machining Process" onclick="window.open('http://www.sixsigmatraining.org/2010/06/figure-3.jpg','Production Capacity for Machining Process','width=537,height=557,left='+(screen.availWidth/2-268.5)+',top='+(screen.availHeight/2-278.5)+'');return false;"  target="_blank">Figure 3 in an earlier article</a>. The requirement for this process is shown in the figure to be 255 units. The team’s idea for the process was to set it up as shown in Figure 7. The U shape will minimize the distance that people need to move. Figure 8 shows the standard operations routine sheet for the process. This sheet graphically shows a time line for each operation, the manual time, the automated machine time, and the travel time. The total time to complete a full cycle for this process is 113 seconds (see either Figure 8 or Table 2.) Although some machines continue to operate automatically at this time, the operator can return to the beginning of the process and start another cycle. By the time the operator reaches each operation on the next cycle, the machines will have completed their cycle and, due to autonomation (Jikoda) they will have automatically stopped.</p>
<p>This process can be operated by one person. A full day’s production can be produced from this process in 28815 seconds. Since a full work day is 51600 seconds, the worker will have time to perform other duties each day, including 5S (see below.)</p>
<p><br class="spacer_" /></p>
<p>Figure 7-Work cell Layout</p>
<p><img title="Work Cell Layout" src="http://www.sixsigmatraining.org/2010/06/figure-7.jpg" alt="Work Cell Layout" width="477" height="277" /></p>
<p>Figure 8-Standard Operations Routine</p>
<p><br class="spacer_" /></p>
<div class="wp-caption alignnone" style="width: 510px"><img title="Standard Operations Routine Sheet" src="http://www.sixsigmatraining.org/2010/06/figure-8.jpg" alt="Standard Operations Routine Sheet" width="500" height="332" /><p class="wp-caption-text">Standard Operations Routine Sheet</p></div>
<p><br class="spacer_" /></p>
<p>Table 2-Process Cycle Time Calculation</p>
<p><img title="Process Cycle Time Calculation" src="http://www.sixsigmatraining.org/2010/06/table-2.jpg" alt="Process Cycle Time Calculation" width="469" height="355" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.sixsigmatraining.org/lean-six-sigma/lean-six-sigma-improvement-and-work-design-part-7.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

